GeoPeaksPlay

Sun Down Express

Sun Down Express (Chairlift) is a lift in Vail, near High Noon Express Lift (base). It climbs 481 m, from 2,865 m to 3,346 m, over 1.78 km.

In feet and miles: 1.11 mi long, rising 1,578 ft, from 9,400 ft to 10,978 ft.

Explore in 3D

Measured by GeoPeaks on the 3D terrain (not figures of the ski area)
Length (horizontal)1.78 km 1.11 mi
Length, station to station1.85 km 1.15 mi
Bottom2,865 m 9,400 ft
Top3,346 m 10,978 ft
Vertical rise481 m 1,578 ft
As mapped in OpenStreetMap
TypeChairlift
Capacity2,400 people per hour
Places per carrier4
Ride time6 min

Map of the lift

Hover or tap a line for its name and numbers; click to open its page.

Wildwood Express Lift (base)High Noon Express Lift (base)Tea Cup Express Lift (base)

© OpenStreetMap · USGS · Copernicus · Credits

Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.

See the whole of Vail →

Runs from its top