GeoPeaksPlay

Sunrise

Sunrise (Chairlift) is a lift in Stowe, near Gondola Skyride (base). It climbs 369 m, from 457 m to 827 m, over 1.32 km.

In feet and miles: 0.82 mi long, rising 1,211 ft, from 1,499 ft to 2,713 ft.

Explore in 3D

Measured by GeoPeaks on the 3D terrain (not figures of the ski area)
Length (horizontal)1.32 km 0.82 mi
Length, station to station1.37 km 0.85 mi
Bottom457 m 1,499 ft
Top827 m 2,713 ft
Vertical rise369 m 1,211 ft
As mapped in OpenStreetMap
TypeChairlift
Places per carrier6

Map of the lift

Hover or tap a line for its name and numbers; click to open its page.

Gondola Skyride (base)Sunny Spruce Quad (base)

© OpenStreetMap · USGS · Copernicus · Credits

Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.

See the whole of Stowe →

Runs from its top