Peruvian
Peruvian (Chairlift) is a lift in Snowbird / Alta, near Aerial Tram (base). It climbs 733 m, from 2,473 m to 3,206 m, over 2.28 km.
In feet and miles: 1.42 mi long, rising 2,405 ft, from 8,114 ft to 10,518 ft.
| Length (horizontal) | 2.28 km 1.42 mi |
|---|---|
| Length, station to station | 2.40 km 1.49 mi |
| Bottom | 2,473 m 8,114 ft |
| Top | 3,206 m 10,518 ft |
| Vertical rise | 733 m 2,405 ft |
| Type | Chairlift |
|---|---|
| Capacity | 1,800 people per hour |
| Places per carrier | 4 |
| Ride time | 8 min |
Map of the lift
Hover or tap a line for its name and numbers; click to open its page.
© OpenStreetMap · USGS · Copernicus · Credits
- this lift
- lifts
Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.
Runs from its top
- Chamonix BowlBlack Diamond 195 m · ↓ 116 m
- Chip's RunBlue Square 997 m · ↓ 280 m
- Double DownBlack Diamond 481 m · ↓ 209 m
- Lupine LoopBlue Square 2.54 km · ↓ 367 m
- Split Rock GullyBlack Diamond 1.22 km · ↓ 273 m