No 3 High Speed Lift
第3高速リフト
No 3 High Speed Lift (Chairlift) is a lift in Shiga Kogen, near 第4ロマンスリフト (base). It climbs 212 m, from 1,567 m to 1,779 m, over 1.01 km.
In feet and miles: 0.63 mi long, rising 696 ft, from 5,141 ft to 5,837 ft.
| Length (horizontal) | 1.01 km 0.63 mi |
|---|---|
| Length, station to station | 1.03 km 0.64 mi |
| Bottom | 1,567 m 5,141 ft |
| Top | 1,779 m 5,837 ft |
| Vertical rise | 212 m 696 ft |
| Type | Chairlift |
|---|---|
| Places per carrier | 4 |
| Ride time | 4 min |
Map of the lift
Hover or tap a line for its name and numbers; click to open its page.
© OpenStreetMap · 出典:国土地理院 測量法に基づく国土地理院長承認(使用)R 8JHs 548 · Copernicus · Credits
- this lift
- lifts
Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.