GeoPeaksPlay

Maruike 1st Triple

丸池第1トリプル

Maruike 1st Triple (Chairlift) is a lift in Shiga Kogen, near Hasuike Triple (base). It climbs 107 m, from 1,462 m to 1,568 m, over 233 m.

In feet and miles: 764 ft long, rising 351 ft, from 4,797 ft to 5,144 ft.

Explore in 3D

Measured by GeoPeaks on the 3D terrain (not figures of the ski area)
Length (horizontal)233 m 764 ft
Length, station to station256 m 840 ft
Bottom1,462 m 4,797 ft
Top1,568 m 5,144 ft
Vertical rise107 m 351 ft
As mapped in OpenStreetMap
TypeChairlift
Places per carrier3
Ride time1 min 24 s

Map of the lift

Hover or tap a line for its name and numbers; click to open its page.

Hasuike Triple (base)

© OpenStreetMap · 出典:国土地理院 測量法に基づく国土地理院長承認(使用)R 8JHs 548 · Copernicus · Credits

Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.

See the whole of Shiga Kogen →

Runs from its top