Critical Path starts near The Stoke (base), in Revelstoke Mountain Resort, at 2,223 m and drops 578 m over 1.97 km, to 1,645 m; difficulty: Blue Square. Its steepest 20 m reach 56 %, #28 of the 67 named runs of Revelstoke Mountain Resort measured by GeoPeaks; its average gradient is 29 %. Lifts to its top: The Stoke; it ends near The Stoke (base).
Length and colour of the stretch mapped in OpenStreetMap; they may differ from the ski area’s. Measured by GeoPeaks · data of November 19, 2026 · not figures of the ski area · How we measure
In feet and miles: 1.22 mi long; 1,896 ft vertical drop, from 7,293 ft to 5,397 ft.
Stretch by stretch
Elevation profile
Hover, tap or use the arrow keys along the run: gradient, distance and altitude of each 50 m stretch. The point follows on the map.
Steepest 20 m: 56 %, 390 m from the top
- under 15 %
- 15–25 %
- 25–35 %
- 35–50 %
- over 50 %
Map of the run
Hover or tap a line for its name and numbers; click to open its page.
© OpenStreetMap · NRCan (OGL – Canada) · Copernicus · Credits
- Blue Squarethis run
- lifts
- ▲ top
- ○ end
Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.
How to reach the top
Lifts to its top
- The Stoke Chairlift · ↑ 631 m
Where it ends
At 1,645 m, near The Stoke (base).
Lifts from its end
- The Stoke Chairlift · ↑ 631 m
Runs from its end
- The Last SpikeGreen Circle 8.17 km · ↓ 912 m
Other runs of the same difficulty
- Devil's Club2.73 km · ↓ 817 mBlue Square50 % max.
- Snow Rodeo1.88 km · ↓ 641 mBlue Square53 % max.
- Wooley Bully1.20 km · ↓ 383 mBlue Square50 % max.
Runs of Revelstoke Mountain Resort with the closest gradient and vertical drop.
How it ranks in Revelstoke Mountain Resort
- #28 of 67steepest 20 m
- #38 of 68average gradient
- #9 of 68vertical drop
- #12 of 68length
Among the 68 named runs of Revelstoke Mountain Resort measured by GeoPeaks. 1 run is left out: its line climbs back up, or has a short pitch far steeper than the rest — maybe a bridge, a tunnel or a cut that the bare-ground relief does not show. Steepest · Longest · Biggest drop
Questions
How long is Critical Path?
Critical Path is 1.97 km long, measured horizontally along its line, and drops 578 m, from 2,223 m to 1,645 m.
How steep is Critical Path?
Its average gradient is 29 %; its steepest 20 m reach 56 %, 390 m from the top.
Which lift goes to the top of Critical Path?
The top of Critical Path is reached by The Stoke (Chairlift).
Where does Critical Path end?
It ends at 1,645 m, near The Stoke (base).
What difficulty is Critical Path?
OpenStreetMap marks it as: Blue Square.
The numbers in detail
| Length (horizontal) | 1.97 km 1.22 mi |
|---|---|
| Top | 2,223 m 7,293 ft |
| Bottom | 1,645 m 5,397 ft |
| Vertical drop | 578 m 1,896 ft |
| Average gradient | 29 % |
| Steepest 20 m | 56 % |
| Difficulty | Blue Square (As mapped in OpenStreetMap) |
Start at the top of Critical Path, right in your browser.
Ski this run