Critical Path starts near Little Bit (base), in Revelstoke Mountain Resort, at 1,009 m and drops 173 m over 451 m, to 836 m; difficulty: Blue Square. Its steepest 20 m reach 60 %, #22 of the 67 named runs of Revelstoke Mountain Resort measured by GeoPeaks; its average gradient is 38 %. It ends near Little Bit (base).
Length and colour of the stretch mapped in OpenStreetMap; they may differ from the ski area’s. Measured by GeoPeaks · data of November 19, 2026 · not figures of the ski area · How we measure
In feet and miles: 0.28 mi long; 568 ft vertical drop, from 3,310 ft to 2,743 ft.
Stretch by stretch
Elevation profile
Hover, tap or use the arrow keys along the run: gradient, distance and altitude of each 50 m stretch. The point follows on the map.
Steepest 20 m: 60 %, 230 m from the top
- under 15 %
- 15–25 %
- 25–35 %
- 35–50 %
- over 50 %
Map of the run
Hover or tap a line for its name and numbers; click to open its page.
© OpenStreetMap · NRCan (OGL – Canada) · Copernicus · Credits
- Blue Squarethis run
- lifts
- ▲ top
- ○ end
Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.
How to reach the top
No lift in our data arrives within 250 m of its top.
Where it ends
At 836 m, near Little Bit (base).
Lifts from its end
- Little Bit Magic carpet · ↑ 10 m
- Revelation Gondola - Upper Gondola · ↑ 899 m
Runs from its end
- Lightning RodBlue Square 614 m · ↓ 232 m
Other runs of the same difficulty
- Tumbelina283 m · ↓ 107 mBlue Square57 % max.
- Lightning Rod614 m · ↓ 232 mBlue Square50 % max.
- Bread & Butter263 m · ↓ 113 mBlue Square60 % max.
Runs of Revelstoke Mountain Resort with the closest gradient and vertical drop.
How it ranks in Revelstoke Mountain Resort
- #22 of 67steepest 20 m
- #16 of 68average gradient
- #44 of 68vertical drop
- #52 of 68length
Among the 68 named runs of Revelstoke Mountain Resort measured by GeoPeaks. 1 run is left out: its line climbs back up, or has a short pitch far steeper than the rest — maybe a bridge, a tunnel or a cut that the bare-ground relief does not show. Steepest · Longest · Biggest drop
Questions
How long is Critical Path?
Critical Path is 451 m long, measured horizontally along its line, and drops 173 m, from 1,009 m to 836 m.
How steep is Critical Path?
Its average gradient is 38 %; its steepest 20 m reach 60 %, 230 m from the top.
Where does Critical Path end?
It ends at 836 m, near Little Bit (base).
What difficulty is Critical Path?
OpenStreetMap marks it as: Blue Square.
The numbers in detail
| Length (horizontal) | 451 m 0.28 mi |
|---|---|
| Top | 1,009 m 3,310 ft |
| Bottom | 836 m 2,743 ft |
| Vertical drop | 173 m 568 ft |
| Average gradient | 38 % |
| Steepest 20 m | 60 % |
| Difficulty | Blue Square (As mapped in OpenStreetMap) |
Start at the top of Critical Path, right in your browser.
Ski this run