GeoPeaksPlay

King Lift #4

キング第4リフト

King Lift #4 (Chairlift) is a lift in Niseko United, near エース第3ペアリフト (base). It climbs 148 m, from 1,024 m to 1,172 m, over 499 m.

In feet and miles: 0.31 mi long, rising 486 ft, from 3,360 ft to 3,845 ft.

Explore in 3D

Measured by GeoPeaks on the 3D terrain (not figures of the ski area)
Length (horizontal)499 m 0.31 mi
Length, station to station520 m 0.32 mi
Bottom1,024 m 3,360 ft
Top1,172 m 3,845 ft
Vertical rise148 m 486 ft
As mapped in OpenStreetMap
TypeChairlift
Places per carrier1
Ride time4 min

Map of the lift

Hover or tap a line for its name and numbers; click to open its page.

© OpenStreetMap · 出典:国土地理院 測量法に基づく国土地理院長承認(使用)R 8JHs 548 · Copernicus · Credits

Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.

See the whole of Niseko United →

Runs from its top