Chair 7
Chair 7 (Chairlift) is a lift in Mt. Baker, near Chair 7 (base). It climbs 173 m, from 1,106 m to 1,280 m, over 670 m.
In feet and miles: 0.42 mi long, rising 568 ft, from 3,629 ft to 4,199 ft.
| Length (horizontal) | 670 m 0.42 mi |
|---|---|
| Length, station to station | 692 m 0.43 mi |
| Bottom | 1,106 m 3,629 ft |
| Top | 1,280 m 4,199 ft |
| Vertical rise | 173 m 568 ft |
| Type | Chairlift |
|---|---|
| Capacity | 2,010 people per hour |
| Places per carrier | 4 |
| Ride time | 9 min 48 s |
Map of the lift
Hover or tap a line for its name and numbers; click to open its page.
© OpenStreetMap · USGS · GEM-15 © Google · Copernicus · Credits
- this lift
- lifts
Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.
Runs from its top
- ExpressoGreen Circle 1.04 km · ↓ 173 m
- Lower White SalmonBlue Square 560 m · ↓ 116 m
- Otto-BahnBlue Square 538 m · ↓ 98 m