Cimalegna-Passo Salati
Cimalegna-Passo Salati (Chairlift) is a lift in Monterosa Ski, near Pianalunga-Bocchetta. It climbs 368 m, from 2,649 m to 3,017 m, over 1.66 km.
In feet and miles: 1.03 mi long, rising 1,207 ft, from 8,691 ft to 9,898 ft.
| Length (horizontal) | 1.66 km 1.03 mi |
|---|---|
| Length, station to station | 1.70 km 1.06 mi |
| Bottom | 2,649 m 8,691 ft |
| Top | 3,017 m 9,898 ft |
| Vertical rise | 368 m 1,207 ft |
| Type | Chairlift |
|---|---|
| Capacity | 2,000 people per hour |
| Places per carrier | 4 |
| Ride time | 6 min 24 s |
Map of the lift
Hover or tap a line for its name and numbers; click to open its page.
© OpenStreetMap · INGV TINITALY · Copernicus · Credits
- this lift
- lifts
Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.