GeoPeaksPlay

Skyeship Express Gondola Stage 2

Skyeship Express Gondola Stage 2 (Gondola) is a lift in Killington, near Skyeship Express Gondola Stage 2 (base). It climbs 410 m, from 715 m to 1,125 m, over 1.46 km.

In feet and miles: 0.91 mi long, rising 1,345 ft, from 2,346 ft to 3,691 ft.

Explore in 3D

Measured by GeoPeaks on the 3D terrain (not figures of the ski area)
Length (horizontal)1.46 km 0.91 mi
Length, station to station1.52 km 0.94 mi
Bottom715 m 2,346 ft
Top1,125 m 3,691 ft
Vertical rise410 m 1,345 ft
As mapped in OpenStreetMap
TypeGondola
Capacity8 people per hour

Map of the lift

Hover or tap a line for its name and numbers; click to open its page.

K-1 Express Gondola (base)Skyeship Express Gondola Stage 2 (base)Canyon Quad (base)

© OpenStreetMap · USGS · Copernicus · Credits

Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.

See the whole of Killington →

Runs from its top