Shirababa 1
白樺第1ペア
Shirababa 1 (Chairlift) is a lift in Hakuba Happo-One, near Gondola Adam (base). It climbs 120 m, from 774 m to 895 m, over 376 m.
In feet and miles: 0.23 mi long, rising 394 ft, from 2,539 ft to 2,936 ft.
| Length (horizontal) | 376 m 0.23 mi |
|---|---|
| Length, station to station | 395 m 0.25 mi |
| Bottom | 774 m 2,539 ft |
| Top | 895 m 2,936 ft |
| Vertical rise | 120 m 394 ft |
| Type | Chairlift |
|---|---|
| Places per carrier | 2 |
Map of the lift
Hover or tap a line for its name and numbers; click to open its page.
© OpenStreetMap · 出典:国土地理院 測量法に基づく国土地理院長承認(使用)R 8JHs 548 · Copernicus · Credits
- this lift
- lifts
Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.
Runs from its top
- Olympic DH womenRed 188 m · ↓ 13 m
- 白樺ゲレンデ北Red 340 m · ↓ 93 m
- 白樺ゲレンデ北Green 390 m · ↓ 91 m
- 白樺ゲレンデ南Red 447 m · ↓ 114 m