GeoPeaksPlay

Payday Hi-Speed Six-Pack

Payday Hi-Speed Six-Pack (Chairlift) is a lift in Deer Valley, near First Time Lift (base). It climbs 387 m, from 2,128 m to 2,515 m, over 1.75 km.

In feet and miles: 1.08 mi long, rising 1,270 ft, from 6,982 ft to 8,251 ft.

Explore in 3D

Measured by GeoPeaks on the 3D terrain (not figures of the ski area)
Length (horizontal)1.75 km 1.08 mi
Length, station to station1.79 km 1.11 mi
Bottom2,128 m 6,982 ft
Top2,515 m 8,251 ft
Vertical rise387 m 1,270 ft
As mapped in OpenStreetMap
TypeChairlift
Places per carrier6

Map of the lift

Hover or tap a line for its name and numbers; click to open its page.

First Time Lift (base)Carpenter ExpressSilverlode Hi-Speed Six Pack

© OpenStreetMap · USGS · Copernicus · Credits

Keyboard: Tab goes through the lines, Enter opens one, + and − zoom, the arrows move the map.

See the whole of Deer Valley →

Runs from its top